Jack Haggerty
First Post
Caliban said:
I think that the "Treat as masterwork for construction times" simply means that you calculate the extra construction time for using a special material based on the cost of a masterwork item, instead of the actual cost of the material. If you actually want to make the item masterwork as well, you spend time and money for that seperately.
So it's 3.5 weeks for creating the base chain shirt, plus twice the time it would take to make a masterwork chain shirt.
Now, there's an interesting interpretation...
Though (with the smith in my example), it'd still take ~4 months for a mithral shirt, and ~7 months for a MW mithral shirt.