Illustrations


log in or register to remove this ad

A split bladed axe...
 

Attachments

  • axe41.jpg
    axe41.jpg
    39.8 KB · Views: 388



Elven Waraxe. I tried a different style with this Elven weapon. The studded section of the shaft is covered in leather.
 

Attachments

  • axe43.jpg
    axe43.jpg
    28 KB · Views: 362



An all metal weapon with a tubular steel shaft. Inset gems give it a bit of flash. I'd consider it an exotic weapon with two attacks much like an urgosh.
 

Attachments

  • sword45.jpg
    sword45.jpg
    20.2 KB · Views: 330



Recent & Upcoming Releases

Remove ads

Top